Zhongxin General engineered a purpose-built 2×800 kVA prefabricated modular substation for Kazakhstan’s Aktau container port — a Belt & Road flagship hub on the Caspian Sea. The 15 m × 10.5 m × 3.7 m unit was split into 5 factory-complete transport modules and delivered 4,500 km overland via Horgos, featuring 14-unit KYN28-12 switchgear, own-manufactured ZHONGXIN GENERAL dry-type transformers, and a climate-adaptive environmental control system engineered for Aktau’s harsh coastal conditions.

A real account of what happened when the allocated vessel space at Shanghai Port could not accommodate an 8,000 kVA 120kV OLTC transformer main tank during export to a DR Congo power station project — the rerouting to Lianyungang Port, the two-and-a-half-month delay, and the practical lessons learned. Written for international buyers and EPC procurement teams planning to source large power transformers from China. Includes recommendations on vessel space booking, port selection for heavy-lift cargo, nitrogen transport verification, and split shipment planning.

Zhongxin General exported a SZ13-8000/120 on-load tap-changing power transformer — 8,000 kVA, 120kV class, 27.8 tonnes total weight — to a power station project in the Democratic Republic of Congo. Independent quality inspection was personally overseen by a former General Manager of Chint Electric’s transformer division. The shipment navigated a real-world logistics challenge when vessel space constraints at the original port required rerouting via Lianyungang. The unit arrived at Mtwara Port, Tanzania on February 4, 2026, with package condition verified as no damage. Switchgear supplied as part of the complete package.

Effective March 2026, Sichuan Zhongxin General Electric Energy Co., Ltd. has officially rebranded its international identity from ZX TRANSFORMER to ZHONGXIN GENERAL — aligning with our product nameplate identity and reflecting an expanded portfolio that now spans transformers, switchgear, prefabricated substations, energy storage, and EV charging infrastructure. Our website, legal entity, products, team, and certifications remain unchanged.

Zhongxin General delivered a SZ20-31500/35 on-load tap-changing transformer for Jing Teng Energy Co., Ltd.’s new dedicated 35kV substation at their Alar City, Xinjiang industrial production base. Rated at 31,500 kVA with a 7-position OLTC providing ±7.5% on-load voltage regulation, this unit was delivered January 12, 2026 and confirmed in full operation by March 2026. This case study covers the complete project lifecycle: factory manufacturing, delivery, on-site installation, and commissioned operation. Also available in 33kV, 34.5kV and 36kV for international substation projects.

Zhongxin General is recruiting part-time regional business representatives worldwide — a flexible, commission-based opportunity for energy and electrical industry professionals to represent a Chinese National Little Giant transformer manufacturer in their local market. Ideal for professionals with existing networks in utilities, EPC contracting, renewable energy, or industrial power. Fully remote, work around your existing schedule. Compensation and terms discussed individually by email.
WhatsApp us
Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly.
Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!
Thank you for leaving message to us, the more specific and detailed your message is, the more targeted reply you will receive, your message usually will be replied within 24 hours!