Transport truck weatherproof covers secured ready to depart — Zhongxin General Nepal Chino Hydropower Station April 17 2026

5000kVA 33kV Hydropower Station Transformer Exported to Nepal — Chino Hydropower Project

On April 17, 2026, Zhongxin General dispatched two S-5000/33GY oil-immersed step-up transformers (5,000 kVA, 33kV/6.3kV, YNd11, ONAN) and a complete switchgear package to Nepal’s Chino Hydropower Station — a 7.9 MW run-of-river project in Manang District, Gandaki Province, with annual generation capacity of 44.38 GWh. Shipped overland with an estimated six-day transit to the China-Nepal border crossing. Full technical specifications, factory acceptance testing, and dispatch photos included.

Read More »

Get In Touch Now

Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly. 

Send a Message to Us

Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!

Get In Touch Now

Thank you for leaving message to us, the more specific and detailed your message is, the more targeted reply you will receive, your message usually will be replied within 24 hours!