
5.175MW/10.03MWh User-Side Battery Storage Project Goes Live at Towngas LNG Facility — Weiyuan, Neijiang
Zhongxin General’s first user-side energy storage project — a 5.175MW/10.03MWh containerized BESS built for a Towngas LNG facility in Weiyuan — is now online and generating stable returns.