Home / Case Studies / Chengdu Xinjin Fangxin 10MW/h User-Side Energy Storage Project

Chengdu Xinjin Fangxin 10MW/h User-Side Energy Storage Project

Aerial view of the Chengdu Xinjin Fangxin 10MW/h user-side battery storage project with technician inspecting the battery container aisle
Zhongxin General has delivered Chengdu's first 10MW/h user-side battery storage project, installed at a manufacturing site in the Xinjin Economic Development Zone. Running on a "two-charge, two-discharge" schedule, the system is already saving the client close to RMB 1 million a year — and it's drawn site visits from two of the city's leading power-industry associations.

Chengdu’s First 10MW/h User-Side Energy Storage Project Goes Live in Xinjin

In June last year, a row of silver-grey storage cabinets in the Chengdu Xinjin Economic Development Zone quietly began doing something new for the local grid: buying and selling power on the client’s behalf, hour by hour. The system — rated 5.175MW/10.03MWh and connected at 10kV — is Chengdu’s first user-side energy storage project built at the 10MW/h scale, and it’s now fully grid-connected and in commercial operation at a manufacturing facility known locally as the Fangxin project.

Two 10kV EMS grid-connection cabinets at the Chengdu Xinjin user-side energy storage project
The two 10kV EMS grid-connection cabinets that tie the storage system into the client’s internal power network.
Aerial view of the Chengdu Xinjin Fangxin 10MW/h user-side battery storage project with technician inspecting the battery container aisle
Bird’s-eye view of the completed site: 24 battery containers, twin step-up transformer cabins, and grid-connection cabinets.

System Configuration and Core Equipment

Zhongxin General served as core equipment supplier and general contractor for the project, delivering the 10kV EMS scheduling and grid-connection cabinets together with the step-up transformer cabin system that ties the storage array into the client’s internal network.

Two step-up transformer cabins at the Chengdu Xinjin user-side energy storage project
The paired step-up transformer cabins that raise the battery system’s output for grid connection.

The battery side is built from 24 containerized units arranged in two parallel rows, giving the site a compact, factory-assembled footprint that shortened on-site installation time considerably.

Two rows of 24 liquid-cooled battery containers at the Chengdu Xinjin 10MW/h energy storage project
Twenty-four battery containers arranged in two parallel rows, forming the core of the 10.03MWh storage array.

A “Two-Charge, Two-Discharge” Schedule Built Around Price Arbitrage

Rather than simply storing and releasing power on a fixed timer, the system runs on an algorithm-driven “two-charge, two-discharge” cycle: it charges during the overnight low-price window and again through the midday flat-price period, then discharges roughly 20,000 kWh of stored power during the morning and evening peak-price windows. The result is a schedule tuned to capture the spread between Sichuan’s peak and off-peak electricity tariffs on a daily basis — easing pressure on the local grid at the moments it’s most stressed, and cutting the client’s annual electricity bill by close to RMB 1 million.

Technician commissioning the step-up transformer cabin at the Chengdu Xinjin user-side storage project
Two Zhongxin General technician commissioning the step-up transformer cabin ahead of grid connection.

Behind the schedule is Zhongxin General’s self-developed smart-grid cloud platform, which reads the site’s load curve and real-time electricity pricing and adjusts the charge/discharge plan accordingly — the same virtual power plant (VPP) capability the company demonstrated at the 2026 China Smart Energy Conference and applied on its earlier 5.175MW/10.03MWh user-side storage project in Weiyuan, Neijiang.

Technician commissioning the virtual power plant control system at the Chengdu Xinjin energy storage project
Commissioning the virtual power plant platform that schedules the system’s charge and discharge cycles.

Built and Operated Under an EMC Model

The project was designed and constructed by Sichuan Zhongxin General Electric Energy Co., Ltd. together with its holding subsidiary, Sichuan Shuzhi Ruian Energy Development Co., Ltd. — a joint venture that pools core technology from Anzhifu, CATL, and Zhongxin General around a “source–grid–load–storage” deployment model, covering everything from substation equipment to production-line power quality to carbon-footprint reporting.

As with Zhongxin General’s other user-side storage deployments, the equipment, installation, and ongoing operation and maintenance are covered under a Contract Energy Management (EMC) arrangement, meaning the client made no upfront capital investment and instead shares in the savings the system generates.

Industry Recognition: Two Association Visits in Two Days

The project’s profile in Chengdu’s power sector was underlined by back-to-back site visits from two industry bodies. On June 19th last year, more than 60 member companies of the Chengdu Electric Power Industry Association toured the site and gathered in front of the grid-connection cabinets for an open discussion of the technology.

Chengdu Electric Power Industry Association and Chamber of Commerce members visiting the Xinjin user-side energy storage project
Members of the Chengdu Electric Power Industry Association and Electric Power Industry Chamber of Commerce discuss the project in front of the grid-connection cabinets.

Association Secretary-General Zhu Kui described user-side storage as one of the newer tools Sichuan’s power users have turned to for managing summer peak demand over the past two years, and called the Fangxin project a reference case worth studying by leading firms across the industry.

Zhongxin General Chairwoman Li Xia explaining the cabin's internal cabinet layout to visitors
Zhongxin General Chairman Li Xia walks visiting delegates through the internal cabinet layout inside the cabin.

The following day, a delegation from the Chengdu Electric Power Industry Chamber of Commerce made the same trip. Chamber President Chen Suqing, touring the site’s control center, noted that interest from both an industry association and a chamber of commerce in the same week is itself a signal of how urgent the demand for user-side storage has become — and placed Zhongxin General at the front of that shift.

Technician explaining the interior of a battery container to visiting delegates at the Xinjin storage project
A Zhongxin General technician walks visitors through the interior layout of one of the site’s 24 battery containers.
Project operations lead explaining the full storage system to visiting industry delegates
The project’s operations lead briefs visiting delegates on how the storage system’s charge/discharge schedule works end to end.
Project staff holding a banner celebrating the grid connection of the Chengdu Fangxin 5.175MW/10.03MWh energy storage project
Project staff mark the occasion with a banner reading “Warmly celebrating the grid connection and commercial operation of the Chengdu Fangxin 5.175MW/10.03MWh energy storage project.”
Chairwoman Li Xia with visiting industry association and chamber of commerce delegates holding an event banner
Chairman Li Xia joins visiting delegates from the Chengdu Electric Power Industry Association and Chamber of Commerce for the “New Energy Industry Inspection and Exchange” event banner.

Part of a Broader Push Into User-Side Storage

The Xinjin project follows the same playbook Zhongxin General has used on other storage deployments across Sichuan, including its HV/MV/LV switchgear and energy storage substation product lines featured across the company’s case studies. Rooted in Xinjin since 2017 and built on eight years of transformer manufacturing for clients including State Grid and China Railway, Zhongxin General has been expanding from equipment supplier toward what it calls a “power partner” model — pairing hardware with its own VPP software and long-term service contracts.

With Chengdu’s first 10MW/h user-side project now online, and two of the city’s power-industry bodies publicly pointing to it as a template, the Fangxin site looks likely to be one of several reference points for how Sichuan’s industrial parks approach storage over the next few years.

For more on Zhongxin General’s storage capabilities, see the Energy Storage Substation product page, browse the full Products range, or get in touch to discuss a project.

Get In Touch Now

Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly. 

Send a Message to Us

Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!