Zhongxin General office building decorated with traditional red lanterns for Spring Festival Year of the Horse 2026

Spring Festival 2026 Greetings and Holiday Notice

As we celebrate Spring Festival 2026 and welcome the Year of the Horse, Zhongxin General extends warm greetings to all customers, partners, and friends. Thank you for your continued support throughout the past year. Our holiday runs February 13-23, with operations resuming February 24. We look forward to working together in the year ahead.

Read More »
Chairman Li Xia and General Manager Zhang Shaokuan jointly presenting Best Performance Benchmark Award at 2026 gala

2026 Chinese New Year Gala: Celebrating Before Spring Festival Break

Sichuan Zhongxin General Electric celebrated Chinese New Year 2026 with 250+ employees in a grand factory gala featuring team recognition awards, entertaining performances by employees and leadership, and professional live streaming. The event marked our commitment to workplace culture and revealed significant business achievements including a 110kV 100MVA main transformer project.

Read More »
Complete 1250kVA dry-type transformer ready for shipment to Europe before packaging

When International Standards Come Knocking: A Technical Refinement Record of Exporting High-Standard Dry-Type Transformers to Europe

March 12, 2025 – When our European client’s supervising engineer arrived at the factory, his first words changed everything: “We need to talk about standards.” What followed was a 27-day journey of manufacturing a 1250kVA, 10.5kV/0.42kV cast resin dry-type transformer that taught us what international standards truly mean. From EU energy efficiency compliance to CE certification, from torque specifications (45-50N·m) to Factory Acceptance Tests, this project pushed our team beyond conventional practices into the realm of global excellence.

Read More »
Zhongxin General technical team after successful completion of 63000kVA 110kV transformer installation and commissioning at Ningxia helium LNG facility

63 MVA / 110 kV Oil-Immersed OLTC Transformer Powers Ningxia LNG & Helium Project – ZHONGXIN GENERAL Case Study

ZX TRANSFORMER delivered a 63MVA/110kV oil-immersed OLTC transformer to Ningxia Helium Technology’s LNG and helium production facility in July 2025. After six months of continuous operation, the transformer achieved zero downtime with stable voltage regulation. Our professional team managed complete project execution from design through installation and commissioning.

Read More »
Front Exterior View of Xinjin District People's Hospital new campus in Chengdu, a modern 129,900 square meter healthcare facility powered by Zhongxin General intelligent power system

Powering Life-Saving Healthcare: Zhongxin General Delivers Intelligent Power Infrastructure for Xinjin District People’s Hospital

Sichuan Zhongxin General Electric Energy Co., Ltd. delivered a comprehensive 16,730 kVA intelligent power distribution system for Xinjin District People’s Hospital’s new 129,900 sqm campus. The project features 12 transformers, 133 switchgear cabinets, Three-in-One intelligent monitoring system, and multi-tier emergency backup infrastructure including diesel generators and 72-hour battery storage, ensuring uninterrupted power for critical medical operations. Zhongxin General works not only as the EPC contractor, but also transformer and switchgear manufacturer in the project

Read More »
Historic group photo at Boruian New Energy 5 GWh energy storage base groundbreaking featuring leaders from Zhongxin General, Anzfu Energy, Sichuan government, in Xinjin District, Chengdu, December 19, 2025

Sichuan Boruian New Energy Storage Base Breaks Ground in Chengdu Xinjin – Joint Venture Between Zhongxin General and Anzfu Energy

Sichuan Boruian New Energy Co., Ltd. held a groundbreaking ceremony on December 19, 2025, for its 300 million RMB energy storage manufacturing base in Xinjin District, Chengdu. The joint venture between Zhongxin General Electric Energy (National “Little Giant” Enterprise) and Jiangsu Anzfu Energy Technology will achieve 5 GWh annual production capacity, supporting China’s dual-carbon goals and the Sichuan-Chongqing region’s clean energy transition.

Read More »

Get In Touch Now

Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly. 

Send a Message to Us

Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!

Get In Touch Now

Thank you for leaving message to us, the more specific and detailed your message is, the more targeted reply you will receive, your message usually will be replied within 24 hours!