Spring Festival 2026 Greetings and Holiday Notice

Zhongxin General office building decorated with traditional red lanterns for Spring Festival Year of the Horse 2026
As we celebrate Spring Festival 2026 and welcome the Year of the Horse, Zhongxin General extends warm greetings to all customers, partners, and friends. Thank you for your continued support throughout the past year. Our holiday runs February 13-23, with operations resuming February 24. We look forward to working together in the year ahead.

Celebrating the Year of the Horse with Gratitude and Hope

Zhongxin General office building decorated with traditional red lanterns for Spring Festival Year of the Horse 2026
Our office building adorned with festive red lanterns, welcoming the Year of the Horse

As the Spring Festival approaches and we prepare to welcome the Year of the Horse, Sichuan Zhongxin General Electric Energy Co., Ltd. extends warm greetings to all our valued customers, trusted partners, and friends around the world.

The past year has been one of growth, collaboration, and shared achievements. Your continued trust and support have been fundamental to our success, and we are deeply grateful for every partnership, every project completed together, and every challenge overcome through mutual commitment.

Holiday Schedule

Spring Festival Holiday Period:

  • Holiday begins: February 13, 2026 (afternoon)
  • Holiday ends: February 23, 2026
  • Operations resume: February 24, 2026

During this time, our team members will be with their families celebrating this cherished traditional festival. We will return refreshed and ready to serve you with renewed energy and dedication.

Together in 2026

As we step into the Year of the Horse – a year traditionally associated with energy, enthusiasm, and forward momentum  – we look forward to continuing our journey together. The partnerships we’ve built, the projects we’ve completed, and the trust we’ve earned inspire us to pursue even greater excellence in the year ahead.

When we return from the Spring Festival holiday, we will bring the same commitment to quality, reliability, and service that has defined our relationships with you. New opportunities await, new projects will emerge, and we are eager to face them alongside valued partners like you.

Our Warmest Wishes

May the Year of the Horse bring you and your loved ones:

  • Health and happiness
  • Prosperity and success
  • Peace and fulfillment
  • Growth and new opportunities

恭喜发财,万事如意!
Wishing you wealth and prosperity, and may all your wishes come true!

Thank you for being part of our journey.

We look forward to working together in 2026 and beyond.

— The Zhongxin General Team

Recent Updates:
Recent Company Milestones
Our 2026 Spring Festival Celebration
Charging Station Infrastructure Upgrade

Assembled prefabricated modular substation for Aktau port Kazakhstan — 15 m × 10.5 m × 3.7 m complete unit, Zhongxin General Chengdu

Custom Prefabricated Modular Substation for Aktau Port, Kazakhstan — A Belt & Road Power Infrastructure Case Study

Zhongxin General engineered a purpose-built 2×800 kVA prefabricated modular substation for Kazakhstan’s Aktau container port — a Belt & Road flagship hub on the Caspian Sea. The 15 m × 10.5 m × 3.7 m unit was split into 5 factory-complete transport modules and delivered 4,500 km overland via Horgos, featuring 14-unit KYN28-12 switchgear, own-manufactured ZHONGXIN GENERAL dry-type transformers, and a climate-adaptive environmental control system engineered for Aktau’s harsh coastal conditions.

Read More »
SZ13-8000/120 OLTC transformer at Lianyungang port ready for vessel loading — China export DR Congo view 1

When Your Transformer Doesn’t Fit the Ship: A Real Lesson in Large Equipment Export Logistics from China

A real account of what happened when the allocated vessel space at Shanghai Port could not accommodate an 8,000 kVA 120kV OLTC transformer main tank during export to a DR Congo power station project — the rerouting to Lianyungang Port, the two-and-a-half-month delay, and the practical lessons learned. Written for international buyers and EPC procurement teams planning to source large power transformers from China. Includes recommendations on vessel space booking, port selection for heavy-lift cargo, nitrogen transport verification, and split shipment planning.

Read More »
Heavy transport truck carrying SZ13-8000/120 OLTC transformer leaving Zhongxin General factory 7PM, 16th, September 2025

8000kVA 120kV OLTC Power Transformer Exported to DR Congo — Full Project Case Study

Zhongxin General exported a SZ13-8000/120 on-load tap-changing power transformer — 8,000 kVA, 120kV class, 27.8 tonnes total weight — to a power station project in the Democratic Republic of Congo. Independent quality inspection was personally overseen by a former General Manager of Chint Electric’s transformer division. The shipment navigated a real-world logistics challenge when vessel space constraints at the original port required rerouting via Lianyungang. The unit arrived at Mtwara Port, Tanzania on February 4, 2026, with package condition verified as no damage. Switchgear supplied as part of the complete package.

Read More »
Zhongxin General factory main gate and front facade — Xinjin District Chengdu Sichuan China

From ZX TRANSFORMER to ZHONGXIN GENERAL: Our Brand Has a New Name

Effective March 2026, Sichuan Zhongxin General Electric Energy Co., Ltd. has officially rebranded its international identity from ZX TRANSFORMER to ZHONGXIN GENERAL — aligning with our product nameplate identity and reflecting an expanded portfolio that now spans transformers, switchgear, prefabricated substations, energy storage, and EV charging infrastructure. Our website, legal entity, products, team, and certifications remain unchanged.

Read More »
SZ20-31500/35 OLTC transformer fully installed on substation foundation — Jing Teng Energy Alar City Xinjiang

31,500 kVA OLTC Transformer Powers New 35kV Substation for Alar Jing Teng Energy — Xinjiang

Zhongxin General delivered a SZ20-31500/35 on-load tap-changing transformer for Jing Teng Energy Co., Ltd.’s new dedicated 35kV substation at their Alar City, Xinjiang industrial production base. Rated at 31,500 kVA with a 7-position OLTC providing ±7.5% on-load voltage regulation, this unit was delivered January 12, 2026 and confirmed in full operation by March 2026. This case study covers the complete project lifecycle: factory manufacturing, delivery, on-site installation, and commissioned operation. Also available in 33kV, 34.5kV and 36kV for international substation projects.

Read More »
Zhongxin General management and sales team — Sichuan Zhongxin General Electric Energy Co., Ltd., China

We’re Recruiting: Part-Time Regional Business Representatives Worldwide | Zhongxin General

Zhongxin General is recruiting part-time regional business representatives worldwide — a flexible, commission-based opportunity for energy and electrical industry professionals to represent a Chinese National Little Giant transformer manufacturer in their local market. Ideal for professionals with existing networks in utilities, EPC contracting, renewable energy, or industrial power. Fully remote, work around your existing schedule. Compensation and terms discussed individually by email.

Read More »

Get In Touch Now

Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly. 

Send a Message to Us

Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!

Get In Touch Now

Thank you for leaving message to us, the more specific and detailed your message is, the more targeted reply you will receive, your message usually will be replied within 24 hours!