On the early evening of April 1, 2026, Zhongxin General dispatched 22 KYN28-12 10kV switchgear panels and 2 SCB18-1600/10.5 cast resin dry-type transformers (5.69% impedance, 3,430 kg each, Dyn11) to Sichuan Ruibai New Energy Materials Co., Ltd. in Zigong, Sichuan — a front-end supplier to CATL’s battery supply chain. The transformers meet GB 20052-2024 Tier 1 efficiency standards. Full technical specifications and project documentation.

Custom Prefabricated Modular Substation for Aktau Port, Kazakhstan — A Belt & Road Power Infrastructure Case Study

Prefabricated modular substation installed on-site at Aktau container port, Kazakhstan — Zhongxin General

Zhongxin General engineered a purpose-built 2×800 kVA prefabricated modular substation for Kazakhstan’s Aktau container port — a Belt & Road flagship hub on the Caspian Sea. The 15 m × 10.5 m × 3.7 m unit was split into 5 factory-complete transport modules and delivered 4,500 km overland via Horgos, featuring 14-unit KYN28-12 switchgear, own-manufactured ZHONGXIN GENERAL dry-type transformers, and a climate-adaptive environmental control system engineered for Aktau’s harsh coastal conditions.

When Your Transformer Doesn’t Fit the Ship: A Real Lesson in Large Equipment Export Logistics from China

SZ13-8000/120 OLTC transformer at Lianyungang port ready for vessel loading — China export DR Congo view 1

A real account of what happened when the allocated vessel space at Shanghai Port could not accommodate an 8,000 kVA 120kV OLTC transformer main tank during export to a DR Congo power station project — the rerouting to Lianyungang Port, the two-and-a-half-month delay, and the practical lessons learned. Written for international buyers and EPC procurement teams planning to source large power transformers from China. Includes recommendations on vessel space booking, port selection for heavy-lift cargo, nitrogen transport verification, and split shipment planning.

8000kVA 120kV OLTC Power Transformer Exported to DR Congo — Full Project Case Study

Heavy transport truck carrying SZ13-8000/120 OLTC transformer leaving Zhongxin General factory 7PM, 16th, September 2025

Zhongxin General exported a SZ13-8000/120 on-load tap-changing power transformer — 8,000 kVA, 120kV class, 27.8 tonnes total weight — to a power station project in the Democratic Republic of Congo. Independent quality inspection was personally overseen by a former General Manager of Chint Electric’s transformer division. The shipment navigated a real-world logistics challenge when vessel space constraints at the original port required rerouting via Lianyungang. The unit arrived at Mtwara Port, Tanzania on February 4, 2026, with package condition verified as no damage. Switchgear supplied as part of the complete package.

From ZX TRANSFORMER to ZHONGXIN GENERAL: Our Brand Has a New Name

Zhongxin General factory main gate and front facade — Xinjin District Chengdu Sichuan China

Effective March 2026, Sichuan Zhongxin General Electric Energy Co., Ltd. has officially rebranded its international identity from ZX TRANSFORMER to ZHONGXIN GENERAL — aligning with our product nameplate identity and reflecting an expanded portfolio that now spans transformers, switchgear, prefabricated substations, energy storage, and EV charging infrastructure. Our website, legal entity, products, team, and certifications remain unchanged.

31,500 kVA OLTC Transformer Powers New 35kV Substation for Alar Jing Teng Energy — Xinjiang

SZ20-31500/35 OLTC transformer fully installed on substation foundation — Jing Teng Energy Alar City Xinjiang

Zhongxin General delivered a SZ20-31500/35 on-load tap-changing transformer for Jing Teng Energy Co., Ltd.’s new dedicated 35kV substation at their Alar City, Xinjiang industrial production base. Rated at 31,500 kVA with a 7-position OLTC providing ±7.5% on-load voltage regulation, this unit was delivered January 12, 2026 and confirmed in full operation by March 2026. This case study covers the complete project lifecycle: factory manufacturing, delivery, on-site installation, and commissioned operation. Also available in 33kV, 34.5kV and 36kV for international substation projects.

We’re Recruiting: Part-Time Regional Business Representatives Worldwide | Zhongxin General

Zhongxin General management and sales team — Sichuan Zhongxin General Electric Energy Co., Ltd., China

Zhongxin General is recruiting part-time regional business representatives worldwide — a flexible, commission-based opportunity for energy and electrical industry professionals to represent a Chinese National Little Giant transformer manufacturer in their local market. Ideal for professionals with existing networks in utilities, EPC contracting, renewable energy, or industrial power. Fully remote, work around your existing schedule. Compensation and terms discussed individually by email.

36.5kV 6300 kVA Oil-Immersed Transformers for Xinjiang Data Center: Powering Western China’s Digital Infrastructure

Split view of installed S11-6300/36.5 transformer and oil-filling process on-site — Xinjiang data center, Zhongxin General

When a large-scale data center project in Xinjiang’s Altay Region needed high-capacity power distribution infrastructure, Zhongxin General (ZX Transformer) was selected to supply a batch of S11-6300kVA/36.5kV oil-immersed transformers — a RMB 20M+ contract delivered on schedule in Q4 2025. From silicon steel cutting in our Sichuan factory to a convoy dispatch thousands of kilometers west, this case study documents the full journey: manufacturing process, complete technical specifications, delivery logistics, and the design choices that make this transformer series particularly suited to data center applications. Also available in 33kV, 34.5kV, 35kV and 36kV for international grid standards.

Get In Touch Now

Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly. 

Send a Message to Us

Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!

Get In Touch Now

Thank you for leaving message to us, the more specific and detailed your message is, the more targeted reply you will receive, your message usually will be replied within 24 hours!