Back to Business After Chinese New Year: Top Industrial Giants Visit Zhongxin General for Power Distribution & Energy Storage Solutions

Zhongxin General Electric sales team and Vice General Manager Xia Fawan in conference room discussion with Guizhou Bijie phosphate-coal chemical project delegation

The first week back from China’s 2026 Spring Festival holiday brought two landmark visits to Zhongxin General. The Guizhou Bijie Phosphate-Coal Chemical Integration Project delegation (CNY 73 billion, China’s largest provincial industrial investment) and senior leaders from Chengdu Construction Engineering Group (China Top 500) both arrived to evaluate Zhongxin General’s dry-type transformers, medium & low voltage switchgear, box-type substations, and energy storage solutions — a powerful endorsement of Zhongxin General’s growing reputation as a full-spectrum industrial power equipment partner.

Spring Festival 2026 Greetings and Holiday Notice

Zhongxin General office building decorated with traditional red lanterns for Spring Festival Year of the Horse 2026

As we celebrate Spring Festival 2026 and welcome the Year of the Horse, Zhongxin General extends warm greetings to all customers, partners, and friends. Thank you for your continued support throughout the past year. Our holiday runs February 13-23, with operations resuming February 24. We look forward to working together in the year ahead.

5-Year Success Story: Our EV Charging Station Upgrade During Spring Festival

Box-type substation manufactured by Sichuan Zhongxin powering the EV charging station after 5 years operation

Five years of success: Our EV charging station powered by Sichuan Zhongxin box-type substation generates $10,000 monthly profit serving heavy-duty trucks. Spring Festival 2026 ground upgrade with heavy reinforcement ensures another decade of reliable operation. Real-world proof of our charging infrastructure capabilities and turnkey project delivery.

2026 Chinese New Year Gala: Celebrating Before Spring Festival Break

Chairman Li Xia and General Manager Zhang Shaokuan jointly presenting Best Performance Benchmark Award at 2026 gala

Sichuan Zhongxin General Electric celebrated Chinese New Year 2026 with 250+ employees in a grand factory gala featuring team recognition awards, entertaining performances by employees and leadership, and professional live streaming. The event marked our commitment to workplace culture and revealed significant business achievements including a 110kV 100MVA main transformer project.

Company Updates: Recent Milestones & Achievements

Delivery truck with banner at Yajiang Group Milin Hydropower Station construction site

Five major achievements in January 2026: three energy storage stations commissioned, substation approved by State Grid, industry award received, hydropower project delivery, and prefabricated substation shipped.

When International Standards Come Knocking: A Technical Refinement Record of Exporting High-Standard Dry-Type Transformers to Europe

Complete 1250kVA dry-type transformer ready for shipment to Europe before packaging

March 12, 2025 – When our European client’s supervising engineer arrived at the factory, his first words changed everything: “We need to talk about standards.” What followed was a 27-day journey of manufacturing a 1250kVA, 10.5kV/0.42kV cast resin dry-type transformer that taught us what international standards truly mean. From EU energy efficiency compliance to CE certification, from torque specifications (45-50N·m) to Factory Acceptance Tests, this project pushed our team beyond conventional practices into the realm of global excellence.

63 MVA / 110 kV Oil-Immersed OLTC Transformer for Ningxia LNG & Helium Project — ZHONGXIN GENERAL Case Study

Zhongxin General technical team after successful completion of 63000kVA 110kV transformer installation and commissioning at Ningxia helium LNG facility

Zhongxin General delivered a 63 MVA / 110 kV oil-immersed OLTC transformer to Ningxia Helium Technology Co., Ltd.’s LNG and high-purity helium production facility in July 2025. The unit steps 110 kV grid supply down to 10.5 kV for a continuous-process facility producing 2 million m³/day LNG and 600,000 m³/year high-purity helium. Six months after commissioning: zero unplanned downtime. This case study covers manufacturing, transport, on-site installation, and confirmed operational performance.

Get In Touch Now

Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly. 

Send a Message to Us

Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!

Get In Touch Now

Thank you for leaving message to us, the more specific and detailed your message is, the more targeted reply you will receive, your message usually will be replied within 24 hours!