Zhongxin General technical team after successful completion of 63000kVA 110kV transformer installation and commissioning at Ningxia helium LNG facility
Zhongxin General delivered a 63 MVA / 110 kV oil-immersed OLTC transformer to Ningxia Helium Technology Co., Ltd.'s LNG and high-purity helium production facility in July 2025. The unit steps 110 kV grid supply down to 10.5 kV for a continuous-process facility producing 2 million m³/day LNG and 600,000 m³/year high-purity helium. Six months after commissioning: zero unplanned downtime. This case study covers manufacturing, transport, on-site installation, and confirmed operational performance.

Project Snapshot

Background: Power for a Continuous-Process Facility

Close-up view of transformer core and copper winding assembly for 110kV 63000kVA oil-immersed power transformer by Zhongxin General
Precision-wound copper coils and silicon steel core assembly. The step-lap core construction minimises no-load losses; the winding geometry directly determines short-circuit withstand performance.

Ningxia Helium Technology Co., Ltd., in strategic partnership with Sany Energy Equipment Co., Ltd., built this facility with a total investment of 520 million RMB. The first phase focuses on two products: liquefied natural gas at 2 million m³/day capacity and high-purity helium at 600,000 m³/year — one of the few domestic helium extraction operations at this scale in China.

Helium is a strategic material. Its applications span semiconductor manufacturing, medical MRI systems, aerospace, and scientific research. Supply constraints and import dependence have made domestic helium production a national priority, which gives this facility an economic and strategic significance beyond its raw production numbers.

The power supply requirement for this application is demanding. High-pressure compression, cryogenic liquefaction, precision decarburisation, and helium separation all run continuously. Any power interruption or sustained voltage instability could compromise product purity, trigger emergency shutdowns, or damage cryogenic equipment. The incoming substation transformer must deliver stable voltage regardless of fluctuations on the 110 kV grid — which is why the client specified an on-load tap-changing design rather than a standard off-circuit unit.

Why OLTC for This Application

Professional technician installing OLTC mechanism on 63MVA 110kV oil-immersed power transformer manufactured by Zhongxin General for Ningxia LNG project
Installing the on-load tap changer mechanism on the 110 kV side. The OLTC enables ±8-step voltage regulation — compensating ±10% grid voltage fluctuations — without interrupting power to the facility.
High-voltage transformer core lamination and insulation detail during assembly of 63000kVA unit for natural gas industry application
Detailed view of core lamination and specialized insulation layers designed for 110kV operation
Transformer winding assembly showing insulation layers and copper conductors for 63MVA power transformer manufactured by Zhongxin General
Multi-layer winding structure with advanced insulation system ensuring optimal electrical performance

An off-circuit tap changer requires the transformer to be de-energised before any tap position change. For a cryogenic gas facility running 24/7, de-energisation is not operationally acceptable. The OLTC mechanism allows tap position changes under full load — the switching sequence happens inside a dedicated oil compartment, isolated from the main tank, with contact transition engineered for tens of thousands of operations over the transformer’s service life.

For the Ningxia facility, this means the substation can compensate for seasonal and diurnal grid voltage variations automatically, without scheduled outages and without dispatching maintenance personnel to the substation.

Manufacturing

Technicians conducting on-load tap changer functionality testing on 63000kVA transformer before vacuum drying at ZX TRANSFORMER factory
Pre-vacuum drying OLTC testing ensures proper mechanical operation before moisture removal process
Quality control testing of OLTC mechanism on 110kV power transformer ensuring voltage regulation capability for Ningxia gas processing facility
Comprehensive OLTC commissioning including operation counting, contact resistance, and sequencing verification
Engineering team conducting final quality inspection of 63MVA transformer active part before lowering into oil tank at Zhongxin General facility
Final quality inspection of the completed active part before tank installation. Core laminations, winding geometry, insulation clearances, and tap lead connections are all verified at this stage.

The core uses grain-oriented silicon steel laminations in a step-lap configuration — the same approach applied to the 16,000 kVA and 31,500 kVA units documented in other case studies on this site, scaled to the demands of a 63 MVA unit. Step-lap construction minimises air gaps between sheets, directly reducing no-load losses. For a transformer that will remain energised continuously for 30+ years, the cumulative energy saving from a well-built core is substantial.

Winding fabrication uses high-conductivity copper with continuous disk winding technology and vacuum pressure impregnation. Before oil-filling, the entire winding assembly undergoes vacuum drying to remove residual moisture from the cellulose insulation — residual moisture is the primary driver of premature insulation aging in oil-immersed transformers.

Core-coil assembly lowered into oil tank with subsequent connection and assembly work at Zhongxin General transformer manufacturing facility
Active part successfully lowered into transformer tank with subsequent assembly and testing work at ZHONGXIN GENERAL factory

Factory Acceptance Testing

Each transformer, especially main transformer, which playes a very critical role in the whole system behind it, undergoes a comprehensive factory acceptance test programme before dispatch:

Transportation

The assembled transformer weighs approximately 80 tonnes. Transport from Zhongxin General’s Chengdu facility to Yanchi County, Ningxia — approximately 1,500 km — required a specialised heavy-transport vehicle, route survey, bridge load assessment, and police escort coordination on restricted sections.

The ONAN cooling radiator panels were removed for transport, reducing overall height and weight to road-legal dimensions. They were packaged separately for on-site reassembly — standard practice for large power transformers.

On-Site Installation and Commissioning

Upon arrival at Gaoshawo Industrial Zone, the Zhongxin General installation team carried out a complete pre-installation inspection — post-transport condition assessment, oil sampling and dielectric testing, and foundation acceptance — before positioning the main unit.

Installation crew assembling ONAN cooling radiators on 63MVA oil-immersed transformer at Gaoshawo Industrial Zone Ningxia
On-site radiator panel installation. Each radiator bank is connected to the main tank via isolation valves, allowing individual banks to be isolated for maintenance without draining the main tank.
Field assembly of cooling radiators for 110kV power transformer at Ningxia natural gas processing plant
Final radiator bank being connected. After all connections are made and tightened, each joint is pressure-tested for oil tightness before the isolation valves are opened.

The commissioning sequence followed standard IEC 60076 practice: pre-energisation checks (insulation resistance, winding resistance, turns ratio confirmation, OLTC operation at all 17 positions), initial no-load energisation, staged load application, protection system coordination testing, and performance verification at full load.

Zhongxin General technical team after successful completion of 63000kVA 110kV transformer installation and commissioning at Ningxia helium LNG facility
The Zhongxin General installation team at the Ningxia facility following successful commissioning in July 2025.

Six Months of Operational Performance

Since July 2025, the 63 MVA / 110 kV OLTC transformer has delivered continuous operation supporting the LNG liquefaction and helium extraction processes at Yanchi County. The key performance outcome:

Zero unplanned downtime over six months of continuous operation.

The transformer has operated through Ningxia’s full seasonal range — summer temperatures above 35°C, winter temperatures below -20°C — at approximately 1,500 m altitude, with the dust and sand loading typical of this industrial environment in northwest China.

Representatives from Ningxia Helium Technology confirmed the transformer’s stable voltage regulation has been critical to maintaining helium extraction product purity, where voltage fluctuations affecting cryogenic equipment could directly impact separation quality.

International Standards Compatibility

The SZ22 series OLTC oil-immersed transformer is available in alternative high-voltage ratings for international substation projects:

Special environmental specifications — high altitude (above 1,000 m), tropical humidity, seismic zones, extreme cold — are available on request.

Related Case Studies

16,000 kVA OLTC Transformer — Dedicated 35kV Industrial Zone Substation The complete production process from core stacking to dispatch — a smaller OLTC unit in the same product family, showing the manufacturing process in detail.

31,500 kVA OLTC Transformer — Jing Teng Energy 35kV Dedicated Substation Main transformer for a new dedicated industrial substation in Alar City, Xinjiang. Delivered January 2026, confirmed in operation March 2026.

Custom Prefabricated Modular Substation — Aktau Port, Kazakhstan A complete substation solution — not just the transformer — for a Belt & Road port project on the Caspian Sea.

8,000 kVA / 120 kV OLTC Transformer — DR Congo Power Station Export International logistics and nitrogen transport for a higher-voltage export project.


About Zhongxin General Electric Energy Co., Ltd.

Zhongxin General is a Sichuan-based National “Little Giant” Enterprise and National High-Tech Enterprise manufacturing oil-immersed and dry-type power transformers (30 kVA to 100 MVA, 0.4 kV to 138 kV), medium-voltage switchgear, prefabricated substations, microgrids, and energy storage systems. The company is a strategic partner of State Grid Corporation of China and China Southern Power Grid.

Contact Our Engineering Team View Oil-Immersed Transformer Product Range Browse All Case Studies

Kevin Z

About the Author

Kevin Z

Kevin Z

About the Author

Kevin Z

Kevin holds dual academic backgrounds in Electrical Engineering and English Language. He is a core member of two selective professional communities — a group of elite electrical engineers and a high-level ESL learning circle. With over 15 years of experience in international marketing and sales, Kevin currently serves as Director of International Trade at Zhongxin General.

Beyond his corporate role, Kevin is also a key member of a distinguished export business network based in Ningbo, Zhejiang — one of China’s most dynamic trade hubs. Through this circle of outstanding export enterprises, he gains deep exposure to best practices in business operations, management strategies, and global trade — insights he brings directly to his work and writing.

Get In Touch Now

Thanks for leaving message to us, in workdays your message will be replied in 24 hours. Please be specific on your needs, so we can reply targetedly. 

Send a Message to Us

Thanks for leaving a message to us, we will reply as soon as possible! The more detailed your message is, the more targeted reply we will make!

Get In Touch Now

Thank you for leaving message to us, the more specific and detailed your message is, the more targeted reply you will receive, your message usually will be replied within 24 hours!